• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
India High Silica Quartz Grit Market
India High Silica Quartz Grit Market

High silica quartz is a type of quartz that contains at least 97% SiO2. It is one of the most abundant minerals on Ear... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan For Packaged Drinking Water From Deep Sea Water
A Business Plan For Packaged Drinking Water From Deep Sea Water

 

Packaged drinking water means water derived from s... Read More

Capacity :
Packaged Drinking Water 80,000 Bottles per day
Plant and Machinery cost:
179.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1204.00Lakhs
Add To Inquiry Basket
Start a Business of Double Wall Corrugated Pipes
Start a Business of Double Wall Corrugated Pipes

Double wall corrugated (DWC) pipes are made from high-densit... Read More

Capacity :
Double Wall Corrugated Pipes 20 MT Per Day
Plant and Machinery cost:
449.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1271.00Lakhs
Add To Inquiry Basket
Set A Paint Rollers Manufacturing Business
Set A Paint Rollers Manufacturing Business

Paint rollers are one of the best ways to get a professional... Read More

Capacity :
Paint Roller 8,000 Pcs Per Day
Plant and Machinery cost:
34.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
227.00Lakhs
Add To Inquiry Basket
A Business Plan for Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse
A Business Plan for Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse

 

Bagasse is primarily found in countries that produ... Read More

Capacity :
Biodegradable Disposable Cups 555.5 Th. Pcs Per Day Biodegradable Disposable Plates 312.5 Th. Pcs Pe
Plant and Machinery cost:
1924.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
2789.00Lakhs
Add To Inquiry Basket
Fatty Alcohol Manufacturing Business Plan
Fatty Alcohol Manufacturing Business Plan

Fatty alcohols, also known as aliphatic alcohols, are slight... Read More

Capacity :
Fatty Alcohol 40 MT Per Day By Product (RBD) Palm Oil 45 MT Per Day
Plant and Machinery cost:
800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
5600.00Lakhs
Add To Inquiry Basket
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan

 

Activated carbon is a type of carbon that has been... Read More

Capacity :
Activated Carbon 2,000 Kg Per Day
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
606.00Lakhs
Add To Inquiry Basket
Start a Production Business of Rubber Granules from Waste Tyre  Time to Start Your Own Production Business of Rubber Granules from Waste Tyre
Start a Production Business of Rubber Granules from Waste Tyre Time to Start Your Own Production Business of Rubber Granules from Waste Tyre

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business of uPVC and CPVC Pipes
Manufacturing Business of uPVC and CPVC Pipes

PVC material is used to cre... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Now Own Banana Wine Production Business Banana Products Manufacturing Business Ideas
Start Now Own Banana Wine Production Business Banana Products Manufacturing Business Ideas

A sort of alcoholic beverage created from bananas is called Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Triacetin
Manufacturing Business Of Triacetin

 

Triacetin, also k... Read More

Capacity :
5,000 MT Per Annum
Plant and Machinery cost:
2206.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
3524.00Lakhs
Add To Inquiry Basket
Set Up E-Waste Recycling Plant
Set Up E-Waste Recycling Plant

 

If you haven&rsqu... Read More

Capacity :
1,41,000 Kgs per annum 1,05,900 Kgs per annum 88,200 Kgs per annum 18,000 Kgs per annum 5.760
Plant and Machinery cost:
107.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
336.00Lakhs
Add To Inquiry Basket
The Most Amazing and Easy Business Plan of Creamy Peanut Butter Manufacture Start Now Creamy Peanut Butter Production
The Most Amazing and Easy Business Plan of Creamy Peanut Butter Manufacture Start Now Creamy Peanut Butter Production

The Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Moringa Leaf Powder business Start Now Agriculture Based Moringa Leaves Powder Business Opportunity
Moringa Leaf Powder business Start Now Agriculture Based Moringa Leaves Powder Business Opportunity

The Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan Of ISO Freight Containers Manufacturing
Business Plan Of ISO Freight Containers Manufacturing

The industry standard for shipping is ISO Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Beneficial Business Idea for Ginger Oil & Ginger Powder Start Today Great Business Opportunity of Ginger Oil & Ginger Powder
Beneficial Business Idea for Ginger Oil & Ginger Powder Start Today Great Business Opportunity of Ginger Oil & Ginger Powder

Although ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setting up Aluminium Cans for Beverages (Two Pieces) Business
Setting up Aluminium Cans for Beverages (Two Pieces) Business

 

Aluminium cans are one of the most popular con... Read More

Capacity :
Aluminium Cans for Beverages Each 330 ml Size: 3,450 Lakh Pcs per Annum
Plant and Machinery cost:
2605.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
7760.00Lakhs
Add To Inquiry Basket
Startup Business of Sorbitol
Startup Business of Sorbitol

Sorbitol is a sugar alcohol... Read More

Capacity :
Sorbitol 3,000 MT Per Annum
Plant and Machinery cost:
58.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
575.00Lakhs
Add To Inquiry Basket
Production Business uPVC and CPVC Pipes
Production Business uPVC and CPVC Pipes

UPVC is a type of plastic p... Read More

Capacity :
CPVC Pipes 50 mm 1,200 MT Per Annum uPVC Pipes 150 mm 2,400 MT
Plant and Machinery cost:
313.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
714.00Lakhs
Add To Inquiry Basket
Setup IV Fluid (FFS Technology) Business
Setup IV Fluid (FFS Technology) Business

IV fluid is a watery soluti... Read More

Capacity :
0
Plant and Machinery cost:
4205.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
5770.00Lakhs
Add To Inquiry Basket
Ferro Alloys, Ferro Silicon, High Carbon Ferro Manganese, Silico Manganese Production Business
Ferro Alloys, Ferro Silicon, High Carbon Ferro Manganese, Silico Manganese Production Business

 

Ferroalloys are alloys consisting of a combina... Read More

Capacity :
0
Plant and Machinery cost:
15692.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
24627.00Lakhs
Add To Inquiry Basket
Start Your Own Business Of Auto Brake Pad And Brake Shoe
Start Your Own Business Of Auto Brake Pad And Brake Shoe

The greatest component of a car's braking system is the Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start production of E-Rickshaw and E-Loader
Start production of E-Rickshaw and E-Loader

An E-Rickshaw is an electric vehicle used as a public transportation. It is an economical, efficient and eco-friendly ... Read More

Capacity :
E-Rickshaw: 6,000 Nos Per Annum, E-Loader: 3,000 Nos Per Annum
Plant and Machinery cost:
56.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
1170.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes with Needles  Manufacturing Plant
Disposable Plastic Syringes with Needles Manufacturing Plant

Disposable plastic syringes with needles are a type of medical device used to inject fluids into or draw ... Read More

Capacity :
-
Plant and Machinery cost:
2533.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
36.00 %
TCI :
0.00 Lakhs
Cost of Project :
5405.00Lakhs
Add To Inquiry Basket
Growing Business of Mix Plaster, Block Jointer, Tile Adhesive and M 20 Concrete (Micro Concrete)
Growing Business of Mix Plaster, Block Jointer, Tile Adhesive and M 20 Concrete (Micro Concrete)

 

Important building supp... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start A Business And Change The World, So Now! Start Your Own Lucrative Business of Protein Based Nutrition Foods
Start A Business And Change The World, So Now! Start Your Own Lucrative Business of Protein Based Nutrition Foods

Foods with a high Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Here Are Some Great Tips on How to Get Started In the Ferro Alloys, Ferro Silicon High Carbon, Ferro Manganese, Silico Manganese Industry
Here Are Some Great Tips on How to Get Started In the Ferro Alloys, Ferro Silicon High Carbon, Ferro Manganese, Silico Manganese Industry

What Are Ferro Alloys, Ferro Silicon High Carbon, Fer... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start a Production  Of Carbon Black N990
Start a Production Of Carbon Black N990

Carbon Black N990 is a highly versatile and durable form of carbon black, which has been specially formulated ... Read More

Capacity :
Carbon Black (N990): 8,000 MT Per Annum
Plant and Machinery cost:
4900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
6200.00Lakhs
Add To Inquiry Basket
Setup plant of Glass Fiber Reinforced Polymer (GFRP) Rebar
Setup plant of Glass Fiber Reinforced Polymer (GFRP) Rebar

Glass fiber reinforced polymer (GFRP) rebar is a... Read More

Capacity :
Glass Fibre Reinforced Polymer (GFRP) Bar (Size 8mm to 36 mm): 360,000 MT Per Annum
Plant and Machinery cost:
600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
6100.00Lakhs
Add To Inquiry Basket
Start Assembling of Lithium Ion Battery (Battery Assembly)
Start Assembling of Lithium Ion Battery (Battery Assembly)

 

A lithium-ion bat... Read More

Capacity :
48 Volt, 60 AH Lithium-Ion Battery Pack 10 Nos per day 48 Volt, 80 AH Lithium-Ion Battery Pack 10 No
Plant and Machinery cost:
165.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
538.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) (Cephalexin, Ampicillin Trihydrate, Ibuprofen and Paracetamol)
Active Pharma Ingredients (API) (Cephalexin, Ampicillin Trihydrate, Ibuprofen and Paracetamol)

 

The Active Pharmaceutical Ingredient (API) is the part of any drug that produce... Read More

Capacity :
Paracetamol: 500 Kgs / day Cephalexin : 500 Kgs / day Ampicillin Trihydrate: 500 Kgs / day Ibuprofen
Plant and Machinery cost:
347.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
1656.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol

 

Active pharmaceutical ingredients are the active substances that are used in th... Read More

Capacity :
Paracetamol : 1,000.0 Kgs / day Azithromycin: 500.0 Kgs / day Amoxicillin Trihydrate: 500.0 Kg
Plant and Machinery cost:
175.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1322.00Lakhs
Add To Inquiry Basket
Production of Low Carbon Ferro Chrome
Production of Low Carbon Ferro Chrome

Production of Low Carbon Ferro Chrome. Opportunities in Fer... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Solar Panel
Solar Panel

Solar panel refers either to a photovoltaic module, a solar thermal energy panel, or to a set of solar photovoltaic (PV) modules electrically conne... Read More

Capacity :
Solar Panel :83.3 KW / day
Plant and Machinery cost:
162.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
804.00Lakhs
Add To Inquiry Basket
Project Opportunities in White Petroleum Jelly Industry
Project Opportunities in White Petroleum Jelly Industry

Project Opportunities in White Petroleum Jelly Industry. Production of White Petroleu... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Bio-Plastic Bags and Containers from Corn Starch
Bio-Plastic Bags and Containers from Corn Starch

Biodegradable plastics are mainly derived from corn, wheat and potato starch. Biodegradable plastics products are ther... Read More

Capacity :
Bio Plastic Bags (Per Bag 25 gms Size): 360,000 Kgs per annum Bio Plastic Containers (Per Containers
Plant and Machinery cost:
546.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
38.00 %
TCI :
0.00 Lakhs
Cost of Project :
2546.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery
Lithium Ion Battery

Lithium-ion batteries are all about the movement of lithium ions: the ions move one way when the battery charges (when... Read More

Capacity :
90 Volt, 180 AH Lithium Ion Battery Pack:100,000 Nos per Annum
Plant and Machinery cost:
1017.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
4978.00Lakhs
Add To Inquiry Basket
Hybrid Electric Scooter Assembling
Hybrid Electric Scooter Assembling

Plug-in hybrids (PHEVs) use an electric motor and battery that can be plugged into the power grid to charge the batter... Read More

Capacity :
15,000 Nos per Annum
Plant and Machinery cost:
95.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
73.00 %
TCI :
0.00 Lakhs
Cost of Project :
279.00Lakhs
Add To Inquiry Basket
Iron Powder from Mill Scale Scrap
Iron Powder from Mill Scale Scrap

Iron powder is an important raw material for industries engaged in the manufacture of powder metallurgy components and... Read More

Capacity :
25 MT/Day
Plant and Machinery cost:
527.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
1077.00Lakhs
Add To Inquiry Basket
Silico Manganese Production
Silico Manganese Production

Silico Manganese Production. Ferroalloys Industry

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Ductile Iron Pipe Fittings Production for Water & Sewage
Ductile Iron Pipe Fittings Production for Water & Sewage

Ductile Iron Pipe Fittings Production for Water & Sewage. DI Pipes Fittings Manuf... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Bicycle Tyre & Tubes Production from Natural Rubber
Bicycle Tyre & Tubes Production from Natural Rubber

Bicycle Tyre & Tubes Production from Natural Rubber. How to Start a Tire and Tubes Manufacturing Business Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Matchbox Manufacturing Business
Matchbox Manufacturing Business

Matchbox Manufacturing Business. Start a Match Box, Matchstick Factory. Safety Matche... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Low Carbon Ferromanganese
Low Carbon Ferromanganese

Ferro Manganse in different gradesa is used in manufacturing of Welding Electrodes & also special types of stick e... Read More

Capacity :
50 MT/Day
Plant and Machinery cost:
904.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
3615.00Lakhs
Add To Inquiry Basket
Low Carbon Ferromanganese Production
Low Carbon Ferromanganese Production

Low Carbon Ferromanganese Production. Manufacturing Project of Low Carbon Ferromangan... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Glass Marble
Glass Marble

Marbles are small balls of colored or... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
E-Rickshaw Assembling
E-Rickshaw Assembling

E-Rickshaws are three wheel battery operated vehicles, which are considered as an upgrade to c... Read More

Capacity :
4 Nos./Day
Plant and Machinery cost:
28.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
323.00Lakhs
Add To Inquiry Basket
Solar Panel
Solar Panel

A solar panel is a collection of solar cells. Solar panel refers either to a photovoltaic module, a solar thermal ener... Read More

Capacity :
25 MW
Plant and Machinery cost:
161.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
54.00%
Break Even Point (BEP):
28.00 %
TCI :
0.00 Lakhs
Cost of Project :
804.00Lakhs
Add To Inquiry Basket
Chrome Plating
Chrome Plating

 

Chrome plating (less commonly chromium plating), often referred to simply as chrome, is a technique of elect... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Piston Rings for IC Engines (Cast Iron)
Piston Rings for IC Engines (Cast Iron)

A piston ring is an expandable split ring used to provide a seal between the piston an the cylinder wall. Piston rings are commonly made from cast ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Low Carbon Ferrochrome
Production of Low Carbon Ferrochrome

High Carbon Ferro- manganese containing about 7% carbon is not suitable for the production of steels or other alloys containing manganese in which ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Wooden Furniture Manufacturing Industry
Wooden Furniture Manufacturing Industry

Wooden Furniture Manufacturing Industry. Furniture Production Factory. Most Profitable Wood Furniture Manufacturing Busine... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Bicycle and Cycle Rickshaw Manufacturing
Bicycle and Cycle Rickshaw Manufacturing

A Bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the ot... Read More

Capacity :
Bicycles (Different Sizes) : 1000 Nos. /Day Cycle Rickshaw : 1000 Nos. Day
Plant and Machinery cost:
336.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
1525.00Lakhs
Add To Inquiry Basket
Medical Disposables (Gowns,Drapes)
Medical Disposables (Gowns,Drapes)

Medical Disposables (Gowns/Drapes)

Surgical gowns are worn by doctors and nurses ... Read More

Capacity :
Surgeon Gowns : 250 Pcs./Day Pateint Gowns : 250 Pcs./Day Bed Sheets : 300 Pcs./Day Pillow Co
Plant and Machinery cost:
204.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
492.00Lakhs
Add To Inquiry Basket
Biofertilizer and  Phosphate Rich Organic Manure (PROM)
Biofertilizer and Phosphate Rich Organic Manure (PROM)

Biofertilizers are cost effective, eco-friendly and when they are required in bulk can be generated at the farm itself. They increase crop yi... Read More

Capacity :
Bio Fertilizer (Liquid): 60,000 Ltrs/Annum Bio Fertilizer (solid) : 60,000 Kgs/Annum Micronutrients
Plant and Machinery cost:
42.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
122.00Lakhs
Add To Inquiry Basket
Micronutrients Fertilizer
Micronutrients Fertilizer

Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of th... Read More

Capacity :
Micronutrient Fertilizer for Fruits : 187,500 Kgs/annum Micronutrient Fertilizer for Vegetabl
Plant and Machinery cost:
23.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
76.00 %
TCI :
0.00 Lakhs
Cost of Project :
114.00Lakhs
Add To Inquiry Basket
Low Carbon Ferromanganese
Low Carbon Ferromanganese

High Carbon Ferro- manganese containing about 7% carbon is not suitable for the production of steels or other alloys containing manganese in which ... Read More

Capacity :
Low Carbon Ferromanganes : 15,000 MT/Annum
Plant and Machinery cost:
371.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
61.00 %
TCI :
2804.00 Lakhs
Cost of Project :
2804.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start Rice Milling Plant - 28.00 824.00
Start Manufacturing of Wo... Wooden Pencils 69,444 Gross Per Day 28.00 2400.00
A Business Plan for Monoc... Monocrystalline Silicon Ingots 400 Kgs Per Day 28.00 555.00
A Business Plan for Fiber... Fiberglass Tape 24,000 Mtrs. Per Day 28.00 442.00
Setup Plant of Compressed... - 28.00 950.00
Production of Galvanized ... 0 0.00 0.00
Business Ideas and Invest... 0 0.00 0.00
Profitable Business Idea ... 0 0.00 0.00
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
12345678910...

Showing 541 - 600 of 676 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR